Wednesday, March 25, 2009 Leveler Parts and Graphics Completed

Just as we where pulling out of the camp, Gary roared up with a UPS package, it is the replacement kick down cylinder for the front drivers side leveling jack. It will be good to have the jack working properly again. It has been a pain pulling it down manually.

 Just as we where pulling out of the camp, Gary roared up with a UPS package, it is the replacement kick down cylinder for the front drivers side leveling jack. It will be good to have the jack working properly again. It has been a pain pulling it down manually.

                                                                                              
Donald got the graphics completed today. The long stripe on the port side gave him the blues it took him three tries to get it on. It was the hardest part of the job. I will get some pictures of the completed job if it ever stops raining.

Donald got the graphics completed today. The long stripe on the port side gave him the blues it took him three tries to get it on. It was the hardest part of the job. I will get some pictures of the completed job if it ever stops raining.

                                        

 

What did you think of this article?




Trackbacks
  • No trackbacks exist for this entry.
Comments
  • No comments exist for this entry.
Leave a comment

Submitted comments will be subject to moderation before being displayed.

 Enter the above security code (required)

 Name

 Email (will not be published)

 Website

Your comment is 0 characters limited to 3000 characters.