Wednesday, March 25, 2009 Leveler Parts and Graphics Completed
Just as we where pulling out of the camp, Gary roared up with a UPS package, it is the replacement kick down cylinder for the front drivers side leveling jack. It will be good to have the jack working properly again. It has been a pain pulling it down manually.
Just as we where pulling out of the camp, Gary roared up with a UPS package, it is the replacement kick down cylinder for the front drivers side leveling jack. It will be good to have the jack working properly again. It has been a pain pulling it down manually.

Donald got the graphics completed today. The long stripe on the port side gave him the blues it took him three tries to get it on. It was the hardest part of the job. I will get some pictures of the completed job if it ever stops raining.
Donald got the graphics completed today. The long stripe on the port side gave him the blues it took him three tries to get it on. It was the hardest part of the job. I will get some pictures of the completed job if it ever stops raining.


Comments